STEP 1 : SURFACE PREPARATION
For new concrete floor, etch with 5% HCL acid, fulsh with fresh water and let dry.
For old concrete floor, flush with fresh water and let dry.
Or SA 2.5 or SSPC – SP10
STEP 2: APPLY ONE COAT OF ANY PRIMER BELOW ACCORDING TO YOUR NEEDS
STEP 3 : INTERMEDIATE & FINISH






