STEP 1 : SURFACE PREPARATION

For new concrete floor, etch with 5% HCL acid, fulsh with fresh water and let dry.

For old concrete floor, flush with fresh water and let dry.

Or SA 2.5 or SSPC – SP10

STEP 2: APPLY ONE COAT OF ANY PRIMER BELOW ACCORDING TO YOUR NEEDS

 

 

 

STEP 3 : INTERMEDIATE & FINISH